Kanza Group
Projects
During 2008 and 2009 Kanza Construction re-constructed much of the sub-grade on KCS's historic Victoria to Rosenberg line.  Kanza moved tons of earth and provided the needed soil stabilization to restore the sub-grade to the specifications required for the expected railcar loads.  Prior to the line re-opening in June 2009 Kanza Tampers put the finishing lift of the track surface.  After many years of non-use, heavy traffic moves along today safely at speeds up to 50 mph.
Kanza  |  709 S. Kansas Ave, Room 200  |  Topeka, Kansas 66603  |  (785) 233-5347  |  Fax (785) 233-3558

Powered by FlipperSiteDeveloper ™