Machine is ready for testing on track.
Repaired Engine Shroud in place
Machine is nearing completion.
Workheads are in place and ready for the new BTI tools.
Cummins factory remanufactured engine is in place.
Oil Cooler has been re-located to front deck
Pre-Wired cab is being connected to main junction box
Cab has been re-wired and placed back on frame
Cab is being rewired prior to installation on the main frame
New components are being installed as they arrive from the OEM
Main frame will get updates prior to assembly
Cab fresh from the paint booth
Main frame is being re-hosed and re-wired
New hoses being routed on frame
Painted main frame in the assembly bay
Painters armed with the "Yellow" paint gun.
Frame with grey primer paint
Sandblasted frame ready for Primer Paint
Bare frame ready for sand blasting
Parts & Components removed from machine
Frame with engine removed