Pump drive is being prepped for the new hydraulic pumps
Mount on front deck for oil cooler relocation
Machine will get several places repainted after new hardware is installed
Buggy loading system has been updated to current specifications
Cab has re-installed on main frame
Workheads and Jack Frame are installed and plumbed in
New jack frame in final position
Main frame re-hosed and ready for cab installation
Cab is painted and pre-wired prior to installation
New wiring harnesses being plugged into main terminal box
New style buggy loading ramps are being fitted to the frame.
New wiring is routed into cab junction box
New Wiring being pulled in Cab junction box
Painted frame in work bay.
Painted frame in work bay. New hoses are being installed
Clamp frame has been remanufactured and is ready for installation
New Workheads ready for installation