Cumberland Coal
 Week 7, almost done. Machine will be oiled and started week 8.  Machine being dismantled.  Frame being lifted off the inner workheads.  Frame being lifted off the workhead assemblies.  Machine being dismantled.  Components being dis-assembled for overhaul.  Machine is shown being dismantled.  Machine cab, ready for sand blasting.  Freshly painted frame  Installation of workheads, Week 3  Inside workheads pinned in place, Week 3  Kanza technician rewiring overhead panel.  Remanufactured light buggy  Week 5, frame is ready for the cab to be replaced.  Cab, with new wiring harnesses  Factory re-manufactured Cummins engine in place.
|
|