Panama Canal 6700
 Pump drive has been remanufactured and is ready for the new pumps to be installed.  New Cummins factory remanufactured engine is in place  Mount on front deck for oil cooler relocation  Machine will get several places repainted after all the new hardware is installed.  Front buggy loading system has been updated to current design. Reference system will also be updated to current length and design.  Cab has been re-installed on the main frame.  New workheads and jack frame are installed and plumbed into the system  New jack frame in final position  Main frame has been re-hosed and is ready for installation of the operators cab  New front axel in place  cab is painted and pre-wired prior to installation  New wiring harnesses are being plugged into main terminal box  New style buggy loading system is being applied to the remanufactured frame.  New wiring is routed into the cab junction box. All the new wiring is routed per the manufacturers original specifications so that machine matches available documentation.  Cab is being rewired prior to installation on the frame.  Frame in work bay ready for installation of new wiring and hoses.  Cab has been repainted and new wiring, glass and upholstery will be installed.  New hoses are being run in the area below where the remanufactured cab will set.  Remanufactured Clamp Frame  Workheads have been remanufactured and are ready for installation on the remanufactured frame.
|
|